My son has graduated from college and moved to China. Not house related- but certainly a big deal here at the house.
Now I just have this "kid" at home.
Saturday, January 2, 2010
Friday, January 1, 2010
Bathroom (almost) Done
My bathroom has been put together for some time but I have not updated posts here. It is not totally done but is at about 98%. Why is it so hard to finish that last little bit??
Here is what it looked liked in the beginning...
And now...
new beadboard on the walls, pedestal sink from the Habitat ReStore. Ikea cabinet that was an exact fit for the space, new lights, towel ring from the ReStore, original medicine cabinet stripped and repainted.
New vinyl floor (tile must wait), toilet paper holder from the Habitat Restore, toilet from the ReStore, original tub.
Before...
After...
vintage ceramic cup holder from ReStore, towel bar from the ReStore, new American Standard Williamsburg faucet.
Exhaust fan from the ReStore added where there was none
Swanstone tub surround, American Standard Williamsburg faucet, showerhead and spout
Original shower curtain rod reinstalled, towel hook from ReStore
I did not change the placement of any of the plumbing fixtures but did update all the plumbing-new supply lines, new vent stack. I kept the original plaster above the beadboard, behind it is new drywall because the old plaster came off with the old crappy tiles.
I put new drywall over the badly cracked plaster ceiling and reinstalled the light that was there. I don't think the light is the original but I love the starburst pattern it casts on the ceiling.
Still to do:
Recaulk around tub
Rechrome door hardware
Install small cabinet in toilet alcove
Resurface tub?
Replace vinyl floor with tile
Don't you hate it when there are repairs to do again before the initial restoration/remodeling is done?
Here is what it looked liked in the beginning...
And now...
new beadboard on the walls, pedestal sink from the Habitat ReStore. Ikea cabinet that was an exact fit for the space, new lights, towel ring from the ReStore, original medicine cabinet stripped and repainted.
New vinyl floor (tile must wait), toilet paper holder from the Habitat Restore, toilet from the ReStore, original tub.
Before...
After...
vintage ceramic cup holder from ReStore, towel bar from the ReStore, new American Standard Williamsburg faucet.
Exhaust fan from the ReStore added where there was none
Swanstone tub surround, American Standard Williamsburg faucet, showerhead and spout
Original shower curtain rod reinstalled, towel hook from ReStore
I did not change the placement of any of the plumbing fixtures but did update all the plumbing-new supply lines, new vent stack. I kept the original plaster above the beadboard, behind it is new drywall because the old plaster came off with the old crappy tiles.
I put new drywall over the badly cracked plaster ceiling and reinstalled the light that was there. I don't think the light is the original but I love the starburst pattern it casts on the ceiling.
Still to do:
Recaulk around tub
Rechrome door hardware
Install small cabinet in toilet alcove
Resurface tub?
Replace vinyl floor with tile
Don't you hate it when there are repairs to do again before the initial restoration/remodeling is done?
Subscribe to:
Posts (Atom)